ADUs

A second home in your backyard.

Accessory Dwelling Units for rental income, family, or flexible space. We manage the full path — design, permits, utilities, and build — to deliver a turnkey, code-compliant ADU that adds real value to your property.

Detached ADU exterior · Whole Homes

What's included

  • —Site evaluation & design
  • —ADU permitting & code compliance
  • —Utility connections
  • —Full kitchen & bath build-out
  • —Finishes & fixtures
  • —Turnkey delivery
How it unfolds

Your ADU project, step by step.

An ADU follows a compressed but complete version of the new-construction sequence — structural, inspections, and systems are all required, plus ADU-specific code compliance covering setbacks, height limits, owner-occupancy rules, and utility separation. California AB 68 and local ADU ordinances have streamlined permitting significantly, but timelines still vary by city. The sequence below reflects a detached ground-up ADU; converted garage or attached ADU sequences vary at the foundation and framing stages.

New construction modern farmhouse · Whole Homes

01 / 04

Feasibility, design & ADU-code permitting

6–14 weeks (design + permit)

Site coverage, setback, height, and utility capacity are assessed against local ADU ordinances and state law. Architectural plans are drawn and submitted; under SB 9 and AB 68, most ministerial ADU permits must be issued within 60 days — though corrections and resubmittals can extend this. Design decisions on unit layout, kitchen, and bath are finalized before permit issuance.

Site prep & utility connections

1–3 weeks

Underground utility stubs — water, sewer, gas, and electrical — are trenched from the existing house or street connection to the ADU pad location. Utility companies are notified and inspections scheduled; this step often has the longest calendar variance due to utility company scheduling.

Foundation

1–2 weeks including cure and inspection

Continuous footings and stem walls or a monolithic slab are formed and poured to the structural engineer's specification, with anchor bolts positioned for the framing plan. A foundation inspection is completed before framing begins.

Framing

1–2 weeks

Floor, wall, and roof framing are erected and sheathed. For a prefabricated or panelized ADU, panels are craned into position and connected on-site; stick-framed ADUs are built conventionally. A framing inspection is completed before dry-in.

Roofing & dry-in

2–5 days

Roofing underlayment is installed immediately after framing inspection to protect the structure from weather. Finish roofing materials — tile, shingle, or metal — are applied, all penetrations are flashed, and the structure is fully weather-sealed before any interior work begins.

Windows & doors

1–2 days

Windows and exterior doors are set in rough openings and flashed to the weather-resistant barrier. Energy-compliant glazing (Title-24) is required; sizes should be ordered at framing to avoid delays.

Rough MEP

1–2 weeks including inspections

All rough plumbing supply, drain, vent, electrical rough-in, and any mini-split line sets are installed and routed to the utility connections placed at the foundation stage. Rough inspections for plumbing, electrical, and mechanical are completed before insulation.

Insulation & drywall

1–2 weeks

Wall and ceiling insulation is installed to Title-24 energy values and inspected, then drywall is hung, taped, floated, and painted. Moisture-resistant drywall is used in the kitchen and bath wet zones.

Kitchen & bath build-out

2–4 weeks

Cabinets are installed in the kitchen and bath; countertops are templated, fabricated, and set. Shower waterproofing and tile are set and grouted in sequence (waterproofing inspection before tile). Vanity, toilet, and all plumbing rough connections are made ready for finish.

Interior finishes, flooring & paint

1–2 weeks

Finish flooring — LVP, tile, or hardwood — is installed throughout the unit. Interior doors, base trim, casing, and closet systems are fitted. Final paint is applied to all walls, ceilings, and trim.

Exterior finishes

1–2 weeks

Siding, stucco, or other cladding is applied and finished to match or complement the main house exterior. Exterior trim, fascia, and any hardscape immediately around the ADU are completed.

Final inspection, Certificate of Occupancy & handoff

3–5 days

All trade systems are trimmed out and function-tested. The city conducts a final inspection covering structure, fire, electrical, plumbing, and energy compliance. Upon sign-off, the Certificate of Occupancy is issued, and we hand over a turnkey, code-compliant unit ready for occupancy.

Instant estimate

What will your project cost?

Three questions, honest 2026 Bay Area ranges — no email required.

1 · Project

2 · Scope

Ready to build something that lasts?

One team handles design, permits, and build — from concept to finished space.

CallTextFree consult